Tuesday, August 21, 2012

It's a Girl!!

When people asked me Friday night when our baby was due, I told them 3 weeks - but I predict that I will be a week or two late. Consequently, when I woke up at 1:15 Saturday morning with cramping, I did not think much of it. After waking up every two hours and until finally just waking up for the morning at 7:00, I thought perhaps I was experiencing false labor. I texted Mom and asked her what she thought: she confirmed my speculations but encouraged me to call my doctor. Around 9:30 I called my doctor's office who had the doctor on duty, Dr. Korey, call me from the hospital. He was not at all convinced I was in labor and quite rudely informed me how I'm not supposed to call until my contractions are 5-7 minutes apart and that I should just calm down. I was very upset with my interaction with him, and actually told him that I was not used to being spoken to that way. After getting off the phone with him, I proceeded to call my various sisters and get their advice on the situation. As the day progressed, my "cramps" seemed to be intensifying even though they were not necessarily growing closer together. At lunch time the contractions were about 2 hours apart still so I decided to go ahead and eat a peanut butter and jelly sandwich for lunch. I spoke with mom about deciphering between Braxton Hicks and real labor, and she asked if I had experienced back pain yet. 
   Well my body must have heard her because my back began to hurt intensely shortly after she got off the phone. Jon was out mowing the lawn so I tried to relieve the pain by thinking of all the random positions I remember seeing in the birthing movies we had to watch...didn't help much. After Jon finished mowing the lawn he decided to stay close by and he was very helpful. He kept track of my contractions: when they happened and their length. As they grew closer together, Mom told me I really should call my doctor. I also had bright red blood in my discharge, which is also not usually a good sign. I was very hesitant to call since I had such a bad experience with the doctor on duty, whom I had never met, so Jon took initiative and called after I took a shower. At this point Jon was asking when I felt a contraction and I remember not being able to distinguish between pain and contractions, so on our contraction sheet he has times with "pain" next to them. He would ask: "Are you having a contraction?" And my response was a few times: "I don't know! PAIN!"
  After my shower Jon had to finish packing (whoops!) and also practically dress me as I oddly did not feel the need to rush. After he finally convinced me to move off the bed and relocate to the car, I kept telling him that I thought he should drive slower. First of all, it was uncomfortable when he drove over bumps. But, more importantly, I did not want to arrive at the hospital to find out that I was not dilated enough to be admitted and be sent home. During the entire car ride my contractions remained about 5 minutes apart. My main thoughts on the way to the hospital: if this is not real labor, this is cruel. 
   We drove up to the main entrance and Jon opened my door. "Would you like me to get you a wheel chair or do you want to walk inside?" "I don't know!" Jon ran into the hospital, told the attendant at the desk why we were there, and came out to get me. He locked the car and walked inside, asking if he could park it later. 
   The maternity ward was all ready for me when I arrived. I decided I didn't want to embarrass myself when I found out I wasn't dilated, so I told them that I had a low pain tolerance - just in case nothing was happening. They wheeled me to room 12 where I put on the gown and laid on the bed. When the doctor came to check on me after a few minutes, I was 4-5 cm dilated and 100% effaced, the baby's head was down and my water was bulging. I recalled looking at the clock on the wall: it was 5:55.
   "I want an epidural, just in case you don't know"I informed the nursing staff. So they tried administering my IV at two locations on my left arm before successfully jabbing me in my left. I remember three nurses working us but I spent the majority of my time lying on my side with my eyes closed. They asked some questions, which I answered when I could or just let Jon take over. Jon asked probably 4 or 5 times if he should go move his car. "No, you should probably stay here. If you get a ticket, just tell them to talk to us and we'll take care of it." That should have been my first indication. 
   I asked a few times about the epidural as time passed and a nurse told me all the equipment was in the hall waiting. They needed to get my blood results back and then the anesthesiologist would do her work. After asking another time or two, a nurse told me that we might not have time for one, and laughed briefly. "That's not funny!" was my immediate response. I remember someone telling me that I was 7 cm dilated. Soon after someone asked if I was ready to push. I told them I didn't know how that felt, but I felt like I was "gagging from the other end." Yes. That means I'm ready. 
   The doctor came, the bed came apart and the stirrups were set up. I could not believe I wasn't getting an epidural and they expected me to push this baby out! The doctor told me to let him know when I felt a contraction coming. I kept telling him that I didn't know what that felt like. Although I couldn't explain what it felt like, when it came I definitely knew! Jon sent Mom a text at 6:55 that I was getting ready to push. 
   Jon thinks it was probably about 5 contractions later, so probably 10 pushes or so, and out came our baby! While I was pushing, I remember saying how I couldn't believe I was having my baby without an epidural. I generally kept my eyes closed, too, during the process because every time I opened them I felt like the doctor was holding a 4 inch needle or some form of weapon. She was born at 7:14, hardly two and a half hours after I would have been considered in "active" labor. I still do not think I have recovered from the shock of not having time for an epidural. 
 

6 lb, 3.5 oz, 19 inches
First family picture




Aunt Kelly and baby Ellie!

Learning how to put on a diaper



 Her little cry!
All wrapped up

Getting warmed up at the tanning bed

Posing with her new hat from the hospital

Daddy and daughter

Holding her little hands





She makes her newborn clothes look big!

Hanging out with Daddy

Sunday, June 3, 2012

Carpet!

After spending time on the window trim, Jon spent several evenings and weekends installing the wood baseboard trim. Trim involves not only installation, but puttying the holes created by the nails, paint, and caulk (to close any gaps between the baseboards and walls). We had a lot of help with the painting from Doug, Donna, & Omar. Our main motivation: to finish in time for the carpet installation set for May 31st!

Before leaving for vacation, Jon cleaned up the basement, swept, and took the doors off the hinges (Dan, who used to install carpet, told him that the carpet installers have to do this if we didn't). 





 Then, when we arrived home on Saturday night, we came home to carpeted basement! It's amazing what carpet does to a room. It no longer echos, it's warmer, and it seems finished! (almost!!)
 Above: Jon celebrating the carpet installation 
 Below: the family room area
 Looking towards the office area
 The "office"

We are so thankful to finally have the carpet installed. I cannot wait until the office items are removed from our second bedroom and reorganized in the basement, making way for the baby's room! It's been a long time coming, but we can finally start spending time in a nice clean, "finished" basement. Now we just need to focus on the laundry room and bathroom.

Windows and Trim

The easy part of the windows was installing the actual window. Now onto the time-consuming aspect: trimming them out. The old walls were panel with a very narrow space between the concrete wall and the paneling made by thin strips of wood instead of having the traditional 2x4 studs. So, since Jon had used 2x4s when putting up the new walls and drywall, he had to completely re-frame the windows and window sills. 

 Jon loves when he is able to recycle old wood taken from other areas in the basement, hence the odd colors to the window sill. He measured the windows, built a sill the could fit right into the window closing the gap between the window and drywall, then cut a piece of trim to make the nosing. So he glued and screwed the nosing into place before installing the window sills.




 Prepping the drywall around the window.

When he installed the window sill piece he wanted to make sure it was not only level but flush against the window and flush with the walls. 

Afterwards, he trimmed out the windows and painted them with two coats of primer and two coats of the white trim paint. 

I'd say a job well done!

Saturday, April 28, 2012

I've Got the Power

This morning Jon and I set out early to purchase some trim needed to finish trimming out the doors in the basement. However after stopping at Elverson Supply and Lowe's we came out empty handed. Apparently nobody makes trim the same way they did in the 1970s. So we came home and went with plan 2: electrical work and baseboards. Jon demonstrated how to wire an outlet for me then let me loose, wiring the rest of the outlets in the family room/office area. 

This is what the outlets looked like when I began: 
 Jon took some shots of me working for proof that I do indeed (occasionally) help him out:

 Step one: connect ground wire with a pig tail. 
 Do the same with the other wires, put the caps on them. 
 Stuff the wires back, strip the tops of the pigtails and then make them into hooks.
 Attach the hooks onto the socket, screw it into place, and make sure it's level.
 The family room's outlets are all ready to go! 
Below is a shot of Jon working on the baseboards. This afternoon Dave Harkins (from church) came over and helped him with some gardening outside, so I was working solo for most of the afternoon. We will all know who to blame if our home goes up in smoke. Now that I think of it, we better install smoke detectors now!
I'll post pictures of the trim and baseboards when he is all done with them. Progress is happening - slow and steady! I'm hoping that we set a date to have the carpet installed for more motivation to get this basement done before Baby Mountz makes an appearance!!!

Thursday, March 29, 2012

Painting the Basement

The past month has been a busy one for Jon and the basement now looks almost ready to live in. Once again I have the easy job: choose the paint colors. However, I also had to decide on the carpet for the living area which took a good few weeks. I ultimately decided on a darker brown, which I will have to show you after it is installed. For the walls a light, warm tan was chosen. The name of the paint, "Tempered Gray," is decieving since it definitely is more brown than gray. Nevertheless, I think I like it. It is difficult to portray colors through pictures, but here are some pictures of the basement walls.



 I decided to paint the trim a bright white:

Here you can really see the recessed lighting we installed a few months ago:
 The color next to the fireplace.

After the first coat of paint, Jon decided it would be best to replace the windows in the living room area and in the laundry room before progressing any further. Omar and Jon tackled that project on a Saturday afternoon. It's amazing how much of an improvement the new windows are!

In the laundry room I wanted a cooler color while keeping it light. So I went with a color called "Bay Waves." You really cannot tell from the picture below. It has a blue hue.


So now our goal will be to do the trim, frame out the windows, finish installing the doors, paint the doors, install the carpet, frame out the post at the bottom of the steps, tile the laundry room floor, and I'm sure more.

Saturday, January 21, 2012

Drywall!

Having drywall up makes the basement seem like a different place! Jon initially started the drywall task with my wonderful laundry chute closet - which I have gladly been using for the past several weeks. Since this photo he has added a ledge to catch the laundry about 3 feet from the ground as well as a shelf on the wall to hold extra supplies. 

 Jon enlisted the help of his dad and his brother, Dan, to help work on the drywall. It took a lot longer than he thought to install, but he is very glad to now be working on the spackeling. Here is the few from the bottom of the steps looking into the "office" and bathroom. You can almost see the soffit towards the left on the ceiling.


 The family room portion (Ok, so Jon hadn't quite finished hanging in here...it's done now, though!).

The laundry room:

 Jon installed a small heater for me in the laundry room. I'm excited for heat!


 Our recessed lights. For the time being Jon has regular (cheap) light bulbs in there until we finish off the lights. 

The magic maker in action!
I'm getting really excited about having the basement finished. Yesterday I ordered the carpet so now I need to settle on a paint choice before Jon finishes sanding and priming. Lots of decisions!

Wednesday, January 4, 2012

The Basement

When we moved into our house in 2010, we decided to renovate the basement in 2012. However, due to flooding in the spring of 2011, we had to move up the planning. However, it is now 2012 and we're still renovating. Therefore I suppose we got what we wanted!

We gutted the basement, starting with the hideous carpet.
Then came down the ceiling and paneling.
To remedy the water problem Jon rented a jackhammer and, with some help from his family, dug a ditch around the entire perimeter of the basement.
After spending weeks on digging, Jon put some stones, a black cloth material, some drainage pipes, more rocks, and a plastic sheet over the ditch.
Our new sump pump! Jon dug a sump pump pit, drilled holes into the walls so that water can reach the sump pump, and added halves of PVC pipes to run the water from the wall to the ditch.
Concrete came next. The tubes are for our washer and new bathroom.
Framing has begun!
I helped out a bit. Jon would measure, I would cut, and he would install.
While we slowly framed, Jon did a lot of plumbing in order to be able to utilize the most possible space with the ceiling and to add the bathroom. Below you can see the new PVC for our washer and laundry room sink.
In the past few weeks and months our furnace cracked so Jon had to put framing and plumbing on hold to fix that problem. It took a lot longer than we thought and resulted in replacing the entire heating system. He installed a Buderas along with a new oil tank in our basement. Currently Jon is spackling the drywall. I'll have to run on down and take some pictures for the next post!